PROJECT
INFO
Type
industrial commercial
Location
OAKA, MAROUSI, ATHENS
Project Duration
JULY 2024 – OCTOBER 2025
Photography
K. AVGERINOU, I. ROUFOPOULOU
Reconstruction and maintenance of the entire stadium (the interior, the, the shell and the surrounding area), construction of 25 new luxury suites (19 VIP, 5 VVIP & the Presidential ), business lounge (hub), locker rooms, physiotherapy room, offices, infrastructure for 6 new Capsule VIP suites, as well as all the infrastructure necessary for the installation of the new state-of-the-art “glass floor” in the playing area.
Architectural study:
DECATHLON S.A. & K–DIVISION








